顶推法用于大跨连续钢桁梁桥施工的探讨 |
Discussion on Incremental Launching Method for Large Span Continuous Steel Truss Bridge Construction |
投稿时间:2012-07-26 |
中文关键词:钢桁梁桥 顶推法 探讨 |
英文关键词:steel truss incremental launching discussion |
基金项目: |
|
摘要点击次数: 1642 |
全文下载次数: 2808 |
中文摘要: |
针对已建成的跨径组合为112+208+112 m的三桁式刚性悬杆加劲连续钢桁梁桥的工程特点,利用ANSYS有限元软件,对顶推法施工方案进行了施工过程受力分析和进一步探讨,为类似桥梁的施工方案的选择提供了借鉴、参考。 |
英文摘要: |
According to engineering characteristics of the completed three trussed rigid suspension bar stiffened continuous steel truss bridge with a span combination of 112 + 208 + 112 m, with the ANSYS finite element software, the construction process stress is analyzed and discussed for the method of jacking construction scheme, which may provides reference for the choice of construction scheme of similar bridge. |
刘尧庆.顶推法用于大跨连续钢桁梁桥施工的探讨[J].石家庄铁道大学学报(自然科学版),2012,(4):53-57. |