北京地下直径线“CRD”工法计算与分析 |
Calculation and Analysis of CRD Excavation Method of Beijing Rail Underground Transit Line |
投稿时间:2009-05-08 |
中文关键词:地下直径线;CRD工法 地表沉降 模拟计算 |
英文关键词:Beijing rail underground transit line CRD method ground settlement numerical simulation |
基金项目: |
|
摘要点击次数: 924 |
全文下载次数: 760 |
中文摘要: |
基于北京地下直径线工程DK6+804.1~DK7+060段的施工设计,介绍了CRD工法施工工序,并采用有限元程序软件对CRD工法施工的各步进行模拟计算,并对计算结果进行分析。 |
英文摘要: |
The construction procedure of CRD excavation method is introduced based on construction design of DK6+804.1~DK7+060 section of Beijing Rail Underground Transit Line Project. Each step of CRD method is numerically simulated by using finite element program and the results are analyzed. |
丁祥,林宝龙,朱永全.北京地下直径线“CRD”工法计算与分析[J].石家庄铁道大学学报:自然科学版,2009,(3):57-60. |