城市轨道交通PPP融资模式风险评价研究 |
Research on the Risk Assessment of PPP Financing Mode of Urban Rail Transit |
投稿时间:2013-07-10 |
中文关键词:PPP项目 熵权法 灰色关联 风险评价 |
英文关键词:PPP financing mode entropy weight analysis method grey relevancy theory risk assessment |
基金项目:国家软科学研究计划(2010GXQ5D320);河北省交通厅项目(Y-2011068) |
|
摘要点击次数: 1847 |
全文下载次数: 2338 |
中文摘要: |
城市轨道交通采用PPP融资模式有效地解决了目前政府部门的资金压力,为项目进行提供了强劲的动力。但由于项目持续时间长,涉及众多复杂的风险因素,因此风险评价成为项目成功运行的关键因素。采用熵权法对识别出的风险因素赋权以确定其主要风险;采用灰色关联理论进行风险评价,以确定承担风险最多的部门以及各部门承担的主要风险,从而有效的规避风险,把损失降到最小,获得最大的经济效益。 |
英文摘要: |
PPP (Public Private Partnerships) as a new kind of project financing mode which can combine the advantages of government, private investor and the financial institution together. PPP financing mode is adopted by urban rail transit to deal with the current financial pressure the government facing effectively, and provide strong driving force for project construction. Due to the long duration and complicated risk factors of PPP project, risk assessment becomes the critical factor for project to operate successful. Entropy weight analysis method was employed to assign weights for risk factors identified to determine the main within those ones, and grey relevancy theory was used to evaluate risks to find out the departments which undertake risks mostly and what are the main risks respectively for those department, so that the risks could be evaded effectively and the loss reduced to minimum to gain the maximum benefit. |
贾丽丽,和鑫,王辉.城市轨道交通PPP融资模式风险评价研究[J].石家庄铁道大学学报(社会科学版),2013(4):29-33. |