复杂岩溶桩基长护筒跟进三维数值模拟分析与研究 |
Three dimensional Numerical Simulation Analysis and Research of Long Steel Casing Follow up for Complicated Karsts Pile Foundations |
投稿时间:2012-06-19 |
中文关键词:复杂岩溶桩基 双护筒跟进 软件模拟计算 研究与应用 |
英文关键词:complicated karsts pile foundations follow up double steel casings software simulation calculation research and application |
基金项目: |
|
摘要点击次数: 2140 |
全文下载次数: 3259 |
中文摘要: |
汤逊湖特大桥岩溶非常发育,岩溶桩基数量为1 968根,约占桩基总数的55%。通过钢护筒下设工艺与midas civil软件对典型岩溶桩基的单、双钢护筒跟进实际工况的三维模拟分析与研究,得出护筒下设至不同溶腔、不同深度时需要确定的筒径与最佳内、外护筒的壁厚,有效地解决了护筒变形、反复坍孔等成孔事故,大大节约了成本,诠释了国内桥梁桩基护筒跟进区域的不确定性。 |
英文摘要: |
The karsts at Tangxunhu Extra large Bridge are fully developed. The quantity of karsts pile foundations is 1968, accounting for approximately 55% of the total pile foundations. In this paper, a three dimensional simulating analysis and research is made of the actual working conditions of following up single, double steel casings of typical karsts pile foundations with the Midas Civil software, which comes to the conclusion that we need to the accurate pipe diameter and the best internal and external wall thickness of steel casings at different dissolved cavity or different depths. It effectively prevents the accident of deformation of steel casings and repeated hole collapse and so on, reduces the cost greatly; and solves the uncertainty of steel casing follow up area of domestic bridge pile foundations. |