后云台山隧道下穿楼房近接施工控制爆破技术
Controlled Blasting Technology for Houyuntai Mountain Tunnel Construction Undercrossing Adjacent Building
投稿时间:2011-11-18  
中文关键词:隧道  下穿楼房  近接施工  控制爆破
英文关键词:tunnel  under passing residential building  adjacent construction  controlled blasting
基金项目:
作者单位
刘伟 中铁十四局集团 隧道工程有限公司 
摘要点击次数: 1566
全文下载次数: 1819
中文摘要:
      连云港东疏港高速公路控制性工程后云台山隧道,进口段处于密集建筑群地段,其中有1栋5层居民楼位于其上方,设计要求施工通过此地段时,爆破振动的速度要控制在2 cm/s以下,给隧道施工提出了极大的挑战。通过对下穿楼房的后云台山隧道采用控制爆破技术,并进行爆破试验及监测,优化爆破参数,最终确保了新建隧道的施工进度和既有建筑结构的安全。
英文摘要:
      Houyuntai Mountain Tunnel is the controlling project of Dongshugang highway in Lianyungang. The entrance region is located in a dense building area, including a 5 story residential building located in its upper. During construction through this area, according to the design requirements, the blasting vibration velocity should be controlled under 2 cm/s or less. The requirements have raised a great challenge to the tunnel construction. With the method of controlled blasting technology, combing with blasting test and monitoring, and by optimizing blasting parameters, the construction progress of the new tunnel and structural safety of existing buildings are finally ensured.
刘伟.后云台山隧道下穿楼房近接施工控制爆破技术[J].石家庄铁道大学学报(自然科学版),2012,(1):63-67.