不良地质条件采用TBM的施工方法 |
TBM Construction Under Unfavorable Geological Conditions |
投稿时间:2011-06-21 |
中文关键词:TBM 不良地质 掘进性能 对策 |
英文关键词:TBM unfavorable geological driving performance strategy |
基金项目: |
|
摘要点击次数: 1802 |
全文下载次数: 2271 |
中文摘要: |
基于TBM(Tunnel boring machine 全断面隧道掘进机)隧道工程不良地质开挖条件,探讨了围岩岩性、断层、挤压、洞壁及掌子面开挖不稳定性对于设备选型、尺寸制约性的影响,针对不同案例,提出了面临不同施工条件的建议和措施。 |
英文摘要: |
Based on the unfavorable geological conditions of TBM excavation, this paper discusses the impact of the surrounding rock, fault, extrusion, stability of excavation, tunnel wall and instability of excavating face on the selection of equipment type and size, presenting the special difficulties faced with TBM excavation and giving proposals and measures for different circumstances. |
孙正良.不良地质条件采用TBM的施工方法[J].石家庄铁道大学学报(自然科学版),2011,(3):97-. |
查看全文 下载PDF阅读器 |
|