地铁盾构侧穿桥桩基施工技术
Metro Shield Side Wear Bridge Pile Foundation Construction Technology
投稿时间:2009-09-09  
中文关键词:盾构  盾构穿桥桩基  积极保护法  盾构过桥
英文关键词:shield passing bridge pile  positive protection  shield passing bridge
基金项目:
作者单位
付静 中铁十八局集团有限公司 
摘要点击次数: 1686
全文下载次数: 1691
中文摘要:
      随着社会的发展,城市地铁成为建设领域的一个新热点。我国许多城市开始了地铁工程建设,其中地铁隧道施工大多采用盾构技术。在城市地铁建设中一般建(构)筑物较为密集,地铁隧道不可避免的正穿或旁穿各类建(构)筑物,各个建(构)筑物又有各自的安全标准和特点,盾构通过时,怎样来保证建(构)筑物安全,成为地铁隧道施工中一个重要技术。结合天津地铁二号线沙柳路站—博山道站区间盾构穿越祁连桥桥桩基施工技术,进行探讨和研究。
英文摘要:
      With the development of society, urban metro becomes a new hot spot in construction industry. Many cities in China begin the construction of subway project. Most of them use the subway shield tunnel construction techniques. The construction is generally intensive in the subway construction in the city because the subways go through directly or nearby various buildings and each building has its own safety standards and features. So how to ensure the construction safety becomes an important technology in the subway construction when the shield passes by. The research in this paper is on the technology of the shield going through the piles of Qilian Bridge between Shaliu Road Station and Boshan Road Station on the second line of Tianjin Metro.
付静.地铁盾构侧穿桥桩基施工技术[J].石家庄铁道大学学报(自然科学版),2009,(4):95-99.
查看全文  下载PDF阅读器
关闭