齐岳山隧道平行导坑快速施工技术 |
Rapid Construction Technique for Parallel Adit of Qiyueshan Tunnel |
投稿时间:2008-09-08 |
中文关键词:平导 快速施工 长大隧道 施工管理 |
英文关键词:parallel adit rapid excavation long tunnel construction management |
基金项目: |
|
摘要点击次数: 1150 |
全文下载次数: 8 |
中文摘要: |
针对齐岳山隧道平导施工,着重阐述施工工艺、方法、机械设备配套和施工管理,分析了掘进循环各工序需要的施工时间及影响快速施工的因素,对施工过程进行科学管理,实现了平导快速施工。 |
英文摘要: |
Construction technology, method, machinery and construction management are introduced in detail with respect to the construction process of parallel adit of Qiyueshan tunnel. In addition, the time length of each excavation process and their influence factors are analysed. Scientific management was used in the construction of the parallel adit, and rapid excavation effect was obtained. |