客运专线32 m整体双线箱梁现浇支架设计与施工
Design and Construction of Supporting System for Grouting Double Line Concrete Box Girder for High Speed Railway
  修订日期:2006-09-20
中文关键词:客运专线  整体箱梁  支架设计  施工技术
英文关键词:high speed railway  double line box girder  supporting system design  construction technology
基金项目:
陈伟
同济大学桥梁工程系,上海200092
摘要点击次数: 963
全文下载次数: 7
中文摘要:
      介绍了甬台温客运专线整体箱梁支架现浇施工的支架设计及施工过程,包括基础处理、支架承载力验算、支架预压、变形沉降测量及支架施工过程中的注意事项等内容。
英文摘要:
      The design and construction method of the supporting system for grouting the double line concrete box girder for High speed railway bridges in Yongtaiwen High Speed Railway is introduced in detail. The method to deal with the foundation, the caleulation o
陈伟.客运专线32 m整体双线箱梁现浇支架设计与施工[J].石家庄铁道大学学报(自然科学版),2006,(4):110-113.
查看全文  下载PDF阅读器
关闭