海底公路隧道施工作业台架结构及适用性分析 |
The Subsea Highway Tunnel Construction Work Bench |
投稿时间:2010-06-02 |
中文关键词:海底隧道 台阶法 CRD法 开挖 二次衬砌 多功能作业台架 |
英文关键词:the subsea tunnel step method CRD method excavation second lining multi functional work bench |
基金项目: |
|
摘要点击次数: 1442 |
全文下载次数: 1749 |
中文摘要: |
海底隧道施工过程中使用了多种作业台架,这些台架各有特点,设计时控制的重点也不同,一般为自制,其结构是否合理,刚度、强度等是否能够满足施工要求,既会影响到安全和施工质量,又会对施工进度产生很大影响。本文就在海底隧道施工中使用的各种作业台架进行了详细介绍,对使用中出现的一些问题和解决的措施也进行了说明。 |
英文摘要: |
The subsea tunnel uses a variety of work benches during construction. The benches have their own characteristics, thus the focus of control in the design is also different. Reasonable structure, stiffness and strength are important to construction safety and quality, and also have a significant impact on the construction schedule. In this paper, various operating benches used in the subsea tunnel construction are described in detail, and some of the problems arising from the use and resolution measures are described. |
付仕保.海底公路隧道施工作业台架结构及适用性分析[J].石家庄铁道大学学报(自然科学版),2010,(2):122-. |
查看全文 下载PDF阅读器 |
|
关闭 |